Archives from November 2011

Confined Space Consulting at Swanbank Power Station

Pinnacle engaged to provide expert confined space consulting and standby rescue.

Read More...

Posted by leec on 24/11 in Confined Space • (0) CommentsPermalink

Bechtel Yarwun Advanced Riggers Workshop

Brushing up on some advanced skills at Bechtel Yarwun

Read More...

Posted by leec on 20/11 in Height SafetyRope Access • (0) CommentsPermalink

Tower Climbing and Rescue for Abigroup

Delivering tower currency training on site in Melbourne.

Read More...

Posted by leec on 18/11 in Height Safety • (0) CommentsPermalink

Fire Suppression System Testing at IOR Energy

Inspection and testing in hard to reach areas - one of our specialties!

Read More...

Posted by leec on 17/11 in Rope AccessFire Services • (0) CommentsPermalink

Working at height training for Abigroup

Pinnacle trains Abigroup in working at heights on-site in Cooroy.

Read More...

Posted by leec on 17/11 in Height Safety • (0) CommentsPermalink

Pinnacle train ER24 Mine Rescue Paramedics at BMA site at Peak Downs

Pinnacle conduct Breathing Apparatus currency training for ER24 Mine Rescue Paramedics at Peak Downs mine.

Read More...

Posted by leec on 15/11 in Confined SpaceEmergency Response and Rescue • (0) CommentsPermalink

Training for Bechtel’s Gladstone workers

Pinnacle train Bechtel’s staff in work at height and confined space

Read More...

Posted by leec on 10/11 in Height SafetyConfined Space • (0) CommentsPermalink

Pinnacle’s Gladstone Training Facility Opens!

On 9 November 2011 we opened the doors of our brand new state of the art training facility in Gladstone.

Read More...

Annual Shutdowns and Outages Excellence Conference

Pinnacle proud sponsors of 7th Annual Shutdowns and Outages Excellence Conference

Read More...

Posted by leec on 08/11 in Height SafetyConfined SpaceEmergency Response and Rescue • (0) CommentsPermalink

Tricky access work on Tallebudgera Bridge for Jemena and Energex

Pinnacle’s Rope Access Technicians assisted Jemena in the installation of high voltage lines across the bridge

Read More...

Posted by leec on 08/11 in Rope Access • (0) CommentsPermalink
Page 1 of 2 pages  1 2 >